Skip to main content

École kā-iskonākwahk School and Waverley West catchment information

École kā-iskonākwahk School is preparing to open in Bridgwater Trails/Prairie Pointe as Pembina Trails' newest school in the 2027-2028 school year, with another school set to open in Bridgwater Lakes in 2029-2030. As a result of the new schools, several changes to catchments and bell times in Waverley West have been proposed, including: 

  • Adding English and French Immersion catchments for École kā-iskonākwahk School, a K-8 dual track English and French Immersion school scheduled to open in the 2027-2028 school year.
  • Changing the French Immersion catchment and the school start time for École South Pointe School
  • Designating a catchment for the English K-8 Bridgwater Lakes School that is expected to open in 2029-2030.

Stay up to date on all the information on École kā-iskonākwahk School and the proposed changes at the following pages: 

École kā-iskonākwahk School information

Waverley West Catchment Changes 2027-2028

image description
Back to top